Stand der Technik - Innovationen in der Ingenieurpraxis
State of the Art - Innovations in Engineering Practice

Uploaded Picture
Heft 174, Dezember 2014, 78. Jahrgang

Holen Sie sich einen Kleinen Einblick aus unserem Aktuellem Journal

Mehlhorn Susanne , Rudolf-Miklau Florian

START_it_up Project: Paving the Path for Transnational Standardization in Natural Hazard Engineering

The article presents the START_it_up project (“State-of-the-Art in Risk Management Technology:

Implementation and Trial for Usability in Engineering Practice and Policy”) which was

carried out in the 5th call of the Alpine Space Programme. The strategic mission of the project

to establish a transnational standardization process for natural hazard engineering is presented

as well as the principles, main activities and major results of the project.

Start_it_up Project: Wegbereitung für transnationale Standardisierung im Naturgefahreningenieurwesen

Der Beitrag behandelt das Projekt START_it_up (“State-of-the-Art in Risk Management

Technology: Implementation and Trial for Usability in Engineering Practice and Policy”) im

5. Call des Alpenraumprogramms. Die strategische Mission des Projektes war die Etablierung

eines Standardisierungsprozesses im Naturgefahreningenieurwesen. Darüber hinaus werden

die wichtigsten Ziele, Maßnahmen und Ergebnisse des Projektes dargestellt.

Bei Fragen zu diesem Artikel wenden Sie sich bitte direkt an den Autor:
Dipl.-Geogr. Mehlhorn Susanne
Bundesministerium für Land- und Forstwirtschaft, Umwelt und Wasserwirtschaft Abteilung III 5 – Wildbach- und Lawinenverbauung
Marxergasse 2
1030 Wien
PD DI Dr. Rudolf-Miklau Florian
Bundesministerium für Land- und Forstwirtschaft, Umwelt und Wasserwirtschaft, Abt. III/5
Marxergasse 2
1030 Wien